Show on map
CA National City Terminal AveEnerSmart Imperial Beach BESS — Postponed · Storage · CA · 6 MW · 5.0 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 9.9 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 10.9 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 11.7 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 11.9 mi away
  • Wind & solar
  • Storage
  • Under construction
  • 10 · 100 · 1,000 MW

CA National City Terminal Ave

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
San Diego County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
69533 generator 21938

Timeline

  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
  • Stated In-service date stated by EIA-860M.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EnerSmart Imperial Beach BESS Postponed Storage 5.0 mi 6
Alvarado Hydro Facility Postponed Hydro 9.9 mi 1.4
EnerSmart Murray BESS Postponed Storage 10.9 mi 21
L3 Harris San Diego Under construction Solar 11.7 mi 1.6
EnerSmart Mesa Heights Sub Station Under construction Storage 11.9 mi 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution