Show on map
Conn Mun Electric Energy Coop — Power plant · Solar · Tesla Inc.CMEEC - Hollyhock Solar — Postponed · Solar · CT · 6 MW · 2.0 mi awayLebanon Solar 2 — Postponed · Solar · CT · 2 MW · 8.2 mi awayLebanon Solar 1 — Postponed · Solar · CT · 2 MW · 8.3 mi awaySubase Microgrid Project — Postponed · Gas, reciprocating engine · CT · 13.1 MW · 9.7 mi awayPlainfield Solar One — Under construction · Solar · CT · 4 MW · 11.8 mi awayGroton Flanders Road Landfill — Under construction · Solar · CT · 5 MW · 13.5 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Conn Mun Electric Energy Coop

Power plant · Solar

Key facts

Power plant · Solarran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
1,243 MWh
Grid
1 kV to Connecticut Light & Power Co (ISNE)
Location
New London County, Connecticut
Operated by
Tesla Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815196
Location id
L100000812564
Eia plant ids
60228
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
1
Transmission owner
Connecticut Light & Power Co
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20254,242
Capacity factor, 20250.142
Net generation (MWh), 20251,243
Balancing authority codeISNE

Solar array

Array area (acres)
5.6
AC capacity (MW)
1
DC capacity (MW)
1.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CMEEC - Hollyhock Solar Postponed Solar 2.0 mi 6
Lebanon Solar 2 Postponed Solar 8.2 mi 2
Lebanon Solar 1 Postponed Solar 8.3 mi 2
Subase Microgrid Project Postponed Gas, reciprocating engine 9.7 mi 13.1
Plainfield Solar One Under construction Solar 11.8 mi 4
Groton Flanders Road Landfill Under construction Solar 13.5 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution