- Wind & solar
- Under construction
- Operating
- Retired
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Operating
- Retired
- Other companies nearby
84 assets · 4 projects
84 assets · 4 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 4 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, cancelled, frozen or not stated). Each is in its tab below.
Tesla Inc.
Independent power producer
Key facts
Independent power producer · 203.2 MW- Capacity held
- 203.2MW
- Assets
- 84
- Projects
- 8
- States
- AZ, CA, CT, HI, MA, MD and more
- Headquarters
- Austin, United States Source: Wikidata
- Website
- tesla.com Source: Wikidata
- Listed
- Nasdaq: TSLA Source: SEC EDGAR
- LEI
- 54930043XZGB27CTOV49 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Gross output of plants with a stake
54 of 55 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 54 of 55 plants with a stake: US plants with an EIA monthly series.100% of the output is from 54 plants recorded as wholly owned.54 plants: operator, wholly owned per EIA-860.Not included: 29 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Solar
Yearly totals
| Year | Solar | Total (MWh) |
|---|---|---|
| 2025 | 152,500 | 152,500 |
| 2024 | 169,137 | 169,137 |
| 2023 | 179,339 | 179,339 |
| 2022 | 193,945 | 193,945 |
| 2021 | 171,753 | 171,753 |
| 2020 | 151,488 | 151,488 |
| 2019 | 150,361 | 150,361 |
| 2018 | 137,977 | 137,977 |
| 2017 | 90,577 | 90,577 |
| 2016 | 30,444 | 30,444 |
| 2015 | 21,398 | 21,398 |
| 2014 | 15,598 | 15,598 |
| 2013 | 4,615 | 4,615 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Projects 8
Capacity
0.03 GW
0.01 GW active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Postponed | Tesla Reno GigaFactory | Solar | 10.4 MW | NV | — | EIA-860M |
| Postponed | CMEEC - Hollyhock Solar | Solar | 6 MW | CT | — | EIA-860M |
| Under construction | Fremont CA AutoFactory | Solar | 3.8 MW | CA | Online 1 Dec 2026 | EIA-860M |
| Under construction | Austin TX GigaFactory | Solar | 2.3 MW | TX | Online 1 Dec 2026 | EIA-860M |
| Postponed | Hamilton College | Solar | 2 MW | NY | — | EIA-860M |
| Under construction | City of Bowie | Solar | 2 MW | MD | Online 1 Dec 2026 | EIA-860M |
| Postponed | Austin TX GigaFactory | Solar | 1 MW | TX | — | EIA-860M |
| Under construction | Tesla Reno GigaFactory | Solar | 1 MW | NV | Online 1 Dec 2026 | EIA-860M |
Assets 84
Assets
84
Capacity
203 MW
- Solar: 203 MW, 84 assets
Operates 84 power plants
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 5
Registers
5
Reuse terms
- 4 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 228
within 25 kmProjects
228
within 25 km
Nearest
0.0 km
Tesla Reno GigaFactory
All 228NearbyShowing all 228 nearby projects. The 50 nearest fill 48 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Tesla Reno GigaFactory × 2 units | Solar | 11.4 MW | 0.0 km away | nearest: Tesla Reno GigaFactory |
| Under construction | Austin TX GigaFactory × 2 units | Solar | 3.3 MW | 0.0 km away | nearest: Austin TX GigaFactory |
| Under construction | Fremont CA AutoFactory | Solar | 3.8 MW | 0.0 km away | nearest: Fremont CA AutoFactory |
| Under construction | City of Bowie | Solar | 2 MW | 0.0 km away | nearest: City of Bowie |
| Announced | Bridgewater 1 | Solar | 5 MW | 0.4 km away | nearest: Town of Halfmoon |
| Announced | Bridgewater 2 | Solar | 5 MW | 0.4 km away | nearest: Town of Halfmoon |
| Under construction | OIT BESS | Storage | 2 MW | 0.6 km away | nearest: Oregon University System OIT Klamath Fal |
| Postponed | Subase Microgrid Project | Gas, reciprocating engine | 13.1 MW | 0.8 km away | nearest: CMEEC - Navy NE Trident |
| Under construction | Las Virgenes MWD - Composting Plant | Solar + storage | 1.4 MW | 1.1 km away | nearest: Las Virgenes Municipal Water District |
| Postponed | Porter Mill Solar | Solar | 46 MW | 1.4 km away | nearest: Wor-Wic Community College - Offsite |
| Under construction | Taft BESS | Storage | 200 MW | 1.6 km away | nearest: BJ's Wholesale Club, Inc- Uxbridge |
| Filed | Crane (Avondale data centre) | Large load | — | 1.6 km away | nearest: Estrella Mountain PV |
| Built | Stream Data Center | Large load | — | 1.9 km away | nearest: Estrella Mountain PV |
| Announced | Marina Landfill Gas | Biomass | 6.4 MW | 1.9 km away | nearest: Monterey Regional Water Pollution Contro |
| Filed | Vaca BESS | Storage | 59.5 MW | 2.2 km away | nearest: Genentech Vacaville Meter #1 |
| Filed | PHX16 Data Center | Large load | — | 2.6 km away | nearest: Estrella Mountain PV |
| Filed | PHX06 Data Center | Large load | — | 2.7 km away | nearest: Intel - Ocotillo Campus Solar |
| Under construction | Vantage Data Center 21 | Large load | — | 2.8 km away | nearest: Estrella Mountain PV |
| Under construction | ALIGNED PHX-04 DATA CENTER | Large load | — | 3.0 km away | nearest: Intel - Ocotillo Campus Solar |
| Under construction | Prime Data Center | Large load | — | 3.0 km away | nearest: Estrella Mountain PV |
| Postponed | CMEEC - Hollyhock Solar | Solar | 6 MW | 3.2 km away | nearest: Conn Mun Electric Energy Coop |
| Postponed | Klamath Solar | Solar | 5 MW | 3.3 km away | nearest: Oregon University System OIT Klamath Fal |
| Announced | Sierra Luna Energy Storage | Storage | 150 MW | 3.4 km away | nearest: Estrella Mountain PV |
| Built | DIGITAL REALTY TRUST CHANDLER | Large load | — | 3.5 km away | nearest: Intel - Ocotillo Campus Solar |
| Built | CYRUSONE - CHANDLER | Large load | — | 3.6 km away | nearest: Intel - Ocotillo Campus Solar |
| Unknown | OHSU DATA CENTER WEST | Large load | — | 3.6 km away | nearest: Oregon Convention Center |
| Postponed | Waste Management Tri-Cities LFGTE | Biomass | 4.8 MW | 3.7 km away | nearest: Fremont CA AutoFactory |
| Filed | Maxim Crane 6257 Edgecore RN01 Sparks | Large load | — | 4.0 km away | nearest: Tesla Reno GigaFactory |
| Under construction | Bartell South PV I | Solar | 3 MW | 4.1 km away | nearest: Onondaga County - Oak Orchard WWTP |
| Postponed | SunEast Hilltop Solar Project | Solar | 20 MW | 4.1 km away | nearest: Town of Halfmoon |
| Under construction | Groton Flanders Road Landfill | Solar | 5 MW | 4.1 km away | nearest: CMEEC - Polaris Park Solar Hybrid |
| Postponed | SunEast Clay Solar Project | Solar | 50 MW | 4.2 km away | nearest: Onondaga County - Oak Orchard WWTP |
| Filed | Maxim Crane - 1574 – SMF Data Center | Large load | — | 4.8 km away | nearest: US GSA - Sacramento |
| Built | COMPASS DATA CENTER - MOONRAKER | Large load | — | 4.8 km away | nearest: Estrella Mountain PV |
| Built | COMPASS DATACENTERS PHX I | Large load | — | 4.9 km away | nearest: Estrella Mountain PV |
| Filed | Peru Ridge - Data Center Building 1 | Large load | — | 5.0 km away | nearest: Tesla Reno GigaFactory |
| Filed | BZI Crane (BTS 107) (Sparks data centre) | Large load | — | 5.1 km away | nearest: Tesla Reno GigaFactory |
| Under construction | Vantage AZ15 | Large load | — | 5.1 km away | nearest: Estrella Mountain PV |
| Under construction | MDD109-NCBP BLDG 11-Manekin | Solar | 2.4 MW | 5.2 km away | nearest: City of Bowie |
| Under construction | NCBP TWELVE, LLC | Solar | 1.2 MW | 5.4 km away | nearest: City of Bowie |
| Under construction | Watson 2 | Solar | 4.9 MW | 5.5 km away | nearest: Broome County |
| Under construction | Watson 1 | Solar | 4.8 MW | 5.5 km away | nearest: Broome County |
| Built | FANNIE MAE UTC DATA CENTER | Large load | — | 5.7 km away | nearest: Frederick County - Landfill |
| Under construction | NCBP Seven | Solar | 2.4 MW | 5.7 km away | nearest: City of Bowie |
| Postponed | TAA Solar Facility | Solar | 2.8 MW | 5.8 km away | nearest: Pima Community College - East Campus |
| Postponed | Frederick-Carroll County Renewable Waste | Waste to energy | 56 MW | 5.8 km away | nearest: Frederick County - Landfill |
| Under construction | NCBP ONE, LLC | Solar | 2.5 MW | 5.8 km away | nearest: City of Bowie |
| Under construction | NCBP TEN, LLC | Solar | 1.4 MW | 6.0 km away | nearest: City of Bowie |
Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES · EPA ICIS-Air
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)