Show on map
- Combustion
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- In development
- Under construction
- Other infrastructure
Coyanosa: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Coyanosa
Gas processing plant
Key facts
Gas processing plant Operating- Location
- Pecos County, Texas
- Operated by
- ETC Field Services LLC
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Capacity (MMcf/d)
- 125
Capacity not stated
All 12 attributes from EIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)
| Attribute | Value |
|---|---|
| City | Coyanosa |
| EPA greenhouse gas reporting (GHGRP) |
|
| Source period | 2017 |
| Dry gas storage capacity | 0 |
| NGL storage capacity | 97,000 |
| ZIP code | 79730 |
| Owner, as the source states it | ETC Field Services LLC |
| Heat content (Btu per cubic foot) | 1,175 |
| Operator, as the source states it | ETC Field Services LLC |
| Capacity (MMcf/d) | 125 |
| Source release | 2017_v2 |
| Plant flow (MMcf/d) | 100 |
Ownership
2 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Energy Transfer | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| ETC Field Services LLC | Operator | EIA Energy Atlas | ||
| ETC Field Services LLC | Owner | EIA Energy Atlas |
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Coyanosa Gas Under construction | Gas, reciprocating engine | 9.3 mi | 10 |
| Chiltepin Solar Postponed | Solar | 11.8 mi | 100 |
| Selenite Springs Solar Contracted | Solar | 14.3 mi | 253 |