Show on map
Coyote Springs II — Power plant · Gas, combined cycle · Avista CorpPDX154 Campus — Filed · Large load · OR · 6.8 mi awayPerennial Wind Chaser Station — Postponed · Gas, combustion turbine · OR · 424 MW · 14.9 mi awayTutuilla Solar — Under construction · Solar · OR · 1.6 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Coyote Springs II

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 86% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
2,159,888 MWh
Grid
500 kV to Avista Corp (BPAT)
Location
Morrow County, Oregon
Operated by
Avista CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2026
Fuel burned MMBtu by year, 2003 to 2026
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
23 years since 2003
Unused energy
354 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
6,965 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
500
Transmission owner
Avista Corp
Balancing authority code
BPAT
Balancing authority name
Bonneville Power Administration
Fuel burned (MMBtu), 202515,043,500
Capacity factor, 20250.859
Heat rate (Btu/kWh), 20256,964.9
Net generation (MWh), 20252,159,888
Balancing authority codeBPAT

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
PDX154 Campus Filed Large load 6.8 mi
Perennial Wind Chaser Station Postponed Gas, combustion turbine 14.9 mi 424
Tutuilla Solar Under construction Solar 15.0 mi 1.6

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution