Crestwood 120 kV line — Transmission lineCity of Detroit Greenfield — Permitted · Solar · MI · 7 MW · 8.1 mi awayEast Windsor cogeneration centre 2 — Under construction · Gas, combustion turbine · Canada · 100 MW · 9.9 mi away123NET — Built · Large load · MI · 10.1 mi awayCity of Detroit Castle Solar — Under construction · Solar · MI · 10 MW · 10.7 mi awayTrenton Channel Energy Center — Under construction · Storage · MI · 220 MW · 13.6 mi awayProject Cannoli Data Center — Filed · Large load · MI · 13.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Crestwood 120 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
120 kV
States crossed
US-MI

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
0
Substations at the ends (as the source names them)
Crestwood
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID174875
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
City of Detroit Greenfield Permitted Solar 8.1 mi 7
East Windsor cogeneration centre 2 Under construction Gas, combustion turbine 9.9 mi 100
123NET Built Large load 10.1 mi
City of Detroit Castle Solar Under construction Solar 10.7 mi 10
Trenton Channel Energy Center Under construction Storage 13.6 mi 220
Project Cannoli Data Center Filed Large load 13.9 mi

Sources EIA-860M · GEM · EPA ICIS-Air · Berkeley Lab · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution