Crimson: location and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Crimson
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- -66,012 MWh
- Grid
- 220 kV to Southern California Edison Co (CISO)
- Location
- Riverside County, California
- Operated by
- RE Crimson LLC
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 4 years since 2022
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -66,012 |
| Balancing authority code | CISO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -66012.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Ownership
2 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| RE Crimson LLC | Operator | EIA-860M | ||
| RE Crimson LLC | Owner | 20.0% | 31 Dec 2025 | EIA-860 |
| Axium Infrastructure US Inc. | Owner | 80.0% | 31 Dec 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Sonoran West Solar EGS Withdrawn | Solar | 7.5 km | 540 |
| Chuckawalla State Prison Postponed | Solar | 10.2 km | 2.1 |
| Ironwood State Prison Postponed | Solar | 10.6 km | 1.1 |
| Rio Mesa SEGF 2 Postponed | Solar thermal | 12.1 km | 250 |
| Sonoran Energy Project Postponed | Gas, combined cycle | 12.5 km | 553 |
| Blythe Solar Power Project Withdrawn | Solar thermal | 12.5 km | 796.8 |
| Rio Mesa Solar Facility 1 Postponed | Solar thermal | 13.9 km | 250 |
| Grace Energy Center Contracted | Solar + storage | 14.1 km | 500 |
Sources
- CAISO Public Queue ReportSource: California ISO