Show on map
Crimson — Power plant · Storage · RE Crimson LLCSonoran West Solar EGS — Solar · CA · 540 MW · 7.5 km awayChuckawalla State Prison — Solar · CA · 2.1 MW · 10.2 km awayIronwood State Prison — Solar · CA · 1.1 MW · 10.6 km awayRio Mesa SEGF 2 — Solar thermal · CA · 250 MW · 12.1 km awaySonoran Energy Project — Gas, combined cycle · CA · 553 MW · 12.5 km awayBlythe Solar Power Project — Solar thermal · CA · 796.8 MW · 12.5 km awayRio Mesa Solar Facility 1 — Solar thermal · CA · 250 MW · 13.9 km awayGrace Energy Center — Solar + storage · CA · 500 MW · 14.1 km away
  • Wind & solar
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
-66,012 MWh
Grid
220 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
RE Crimson LLC

Output

Net generation MWh by year, 2022 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
4 years since 2022
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
220
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-66,012
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -66012.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

2 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
RE Crimson LLC Operator EIA-860M
RE Crimson LLC Owner 20.0% 31 Dec 2025 EIA-860
Axium Infrastructure US Inc. Owner 80.0% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Sonoran West Solar EGS Withdrawn Solar 7.5 km 540
Chuckawalla State Prison Postponed Solar 10.2 km 2.1
Ironwood State Prison Postponed Solar 10.6 km 1.1
Rio Mesa SEGF 2 Postponed Solar thermal 12.1 km 250
Sonoran Energy Project Postponed Gas, combined cycle 12.5 km 553
Blythe Solar Power Project Withdrawn Solar thermal 12.5 km 796.8
Rio Mesa Solar Facility 1 Postponed Solar thermal 13.9 km 250
Grace Energy Center Contracted Solar + storage 14.1 km 500

Sources CAISO · EIA-860M

Sources

Attribution