CSU Long Beach — Power plant · Storage · Hybrid-Electric Building Technologies West Los Angeles 1, LLCWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 5.6 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 6.8 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 7.8 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 7.9 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 7.9 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 8.0 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 8.2 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 10.5 mi awayVS HR Warner NEM, LLC — Under construction · Solar · CA · 1 MW · 11.0 mi awaySolar Photovoltaic Project #47 — Postponed · Solar · CA · 1 MW · 12.4 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 12.7 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 13.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

CSU Long Beach

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
-547 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
9 years since 2017
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-547
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -547.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Hybrid-Electric Building Technologies West Los Angeles 1, LLC Operator EIA-860M
Sk Holdings Co. Ltd. Owner 50.0% Dec 31, 2025 EIA-860
SUSI Partners AG Owner 50.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Westminster Reliability Project, LLC Under construction Storage 5.6 mi 110
Elevate Pier S Filed Storage 6.8 mi 70
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 7.8 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 7.9 mi 1.3
Fordyce - SLLAX680 Under construction Solar 7.9 mi 1.3
Dominguez - SLLAX512 Under construction Solar 8.0 mi 1.3
Watson Cogeneration Withdrawn Gas, combined cycle 8.2 mi 94.2
San Pedro Public Market (SPPM) Under construction Solar 10.5 mi 1.2
VS HR Warner NEM, LLC Under construction Solar 11.0 mi 1
Solar Photovoltaic Project #47 Postponed Solar 12.4 mi 1
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 12.7 mi 1.4
Bandini - SLLAX710 Under construction Solar 13.9 mi 1.3

Sources EIA-860M · CAISO