Show on map
Daggett 2 — Power plant · Solar · Daggett Solar Power 2 LLCSolar Photovoltaic Project #40 — Solar · CA · 10 MW · 1.2 km awaySolar Photovoltaic Project #41 — Solar · CA · 10 MW · 1.2 km awayMinneola Solar — Solar · CA · 3 MW · 8.0 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
518,910 MWh
Grid
230 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California
Operated by
Daggett Solar Power 2 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20251,841,820
Capacity factor, 20250.189
Net generation (MWh), 2025518,910
Balancing authority codeCISO

Solar arrays

Array area (acres)
960.2
AC capacity (MW)
182
DC capacity (MW)
240
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #40 Postponed Solar 1.2 km 10
Solar Photovoltaic Project #41 Postponed Solar 1.2 km 10
Minneola Solar Under construction Solar 8.0 km 3

Sources EIA-860M

Sources

Attribution