Show on map
Dallman — Power plant · Coal · City of Springfield - (IL)CENTRAL COMPUTING FACILITY, CMS — Large load · IL · 6.9 km awayLincoln Land Energy Center — Gas, combined cycle · IL · 1,276.8 MW · 19.7 km awaySangamon Wind Two LLC — Wind · IL · 100 MW · 22.8 km away
  • Combustion
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 45% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
900,919 MWh
Grid
138 kV, 69 kV to City of Springfield - (IL) (MISO)
Location
Sangamon County, Illinois

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
17 years since 2009
Unused energy
1,115 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,622 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
City of Springfield - (IL)
Share pct
100
Gem entity id
E100000002229
Unit ids
G100000101937, G100000101938, G100000101939, G100000101940
Location id
L100000103856
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110056956281
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001529
Fuel burned (MMBtu), 202510,470,563
Capacity factor, 20250.447
Heat rate (Btu/kWh), 202511,622.1
Net generation (MWh), 2025900,919.0
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
387.7 MW
Generators retired
3
Capacity still in service
230.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal90.2 MWRetiredDecember 2020
2Conventional Steam Coal90.2 MWRetiredDecember 2020
3Conventional Steam Coal207.3 MWRetiredMarch 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV, 69 kV
Transmission or distribution system owner
City of Springfield - (IL)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Springfield - (IL) Operator EIA-860M
CITY OF SPRINGFIELD ILLINOIS Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 3 scheduled to retire, 207.3 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 180.4 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CENTRAL COMPUTING FACILITY, CMS Built Large load 6.9 km
Lincoln Land Energy Center Announced Gas, combined cycle 19.7 km 1,276.8
Sangamon Wind Two LLC Postponed Wind 22.8 km 100