Deepwater: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Deepwater
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 0% of 2014 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1930
- Net generation, 2014
- 662 MWh
- Grid
- 138 kV to Atlantic City Electric Co (PJM)
- Location
- Salem County, New Jersey
- Operated by
- Calpine New Jersey Generation LLC
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- Calpine Corporation
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 96 years since 1930
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2014
- First unit retired
- April 2004
- Capacity retired
- 226.7 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 4 | Petroleum Liquids | 53 MW | Retired | April 2004 |
| GTA | Natural Gas Fired Combustion Turbine | 18.6 MW | Retired | May 2005 |
| 1 | Natural Gas Steam Turbine | 81.6 MW | Retired | June 2014 |
| 6 | Natural Gas Steam Turbine | 73.5 MW | Retired | June 2014 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 155.1 MW | |
| Petroleum Liquids | 53 MW | |
| Natural Gas Fired Combustion Turbine | 18.6 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Atlantic City Electric Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Transmission lines within 15 mi (10)
- Upper Pittsgrove - Deepwater 138 kV
- Landis Station - Deepwater 138 kV
- Chambers - Churchtown 230 kV
- Cumberland Nj - Churchtown 230 kV
- Chambers - Pedricktown 230 kV
- New Castle - Christiana 138 kV
- Edgemoor - New Castle 138 kV
- New Castle 138 kV line
- Basin Road - New Castle 138 kV
- Edgemoor - Christiana 138 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Calpine New Jersey Generation LLC | Operator | EIA-860M | ||
| Calpine Corporation | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 6 scheduled to retire, 155.1 MW · EIA-860M
- Stated Unit GTA scheduled to retire, 18.6 MW · EIA-860M
- Stated Unit 4 scheduled to retire, 53 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Deepwater Postponed | Gas, combustion turbine | 0.0 mi | 456 |
| Carneys Point Solar 1 LLC Under construction | Solar | 4.7 mi | 3 |
| JP MORGAN CHASE - 4001 GOVERNOR PRINTZ BLVD Built | Large load | 4.9 mi | |
| JP MORGAN CHASE - BEAR CHRISTIANA ROAD Built | Large load | 8.3 mi | |
| DXC TECHNOLOGY SERVICES LLC Built | Large load | 12.6 mi | |
| LNH INC DBA HOSTING.COM - 350 PENCADER Built | Large load | 14.3 mi | |
| LNH INC DBA HOSTING.COM - 650 PENCADER Built | Large load | 14.4 mi |
Sources EIA-860M · EPA ICIS-Air