Denison Solar Array: location and 15 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Denison Solar Array
Power plant · Solar
Key facts
Power plant · Solarran 12% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2017
- Net generation, 2025
- 2,018 MWh
- Grid
- 12 kV to Ohio Power Co (PJM)
- Location
- Licking County, Ohio
- Operated by
- Onsite Partners, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 6,885 |
| Capacity factor, 2025 | 0.121 |
| Net generation (MWh), 2025 | 2,018 |
| Balancing authority code | PJM |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 9.9
- AC capacity (MW)
- 1.9
- DC capacity (MW)
- 2.3
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2017
Source USPVDB
Source
- U.S. Large-Scale Solar Photovoltaic DatabaseMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Large-Scale Solar Photovoltaic Database (USPVDB) — USGS and LBNL; one row per facility with its array footprintMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| CMH47 Land Development Bulkhead Filed | Large load | 6.2 km | |
| Union Ridge Solar Under construction | Solar | 14.4 km | 108 |
| ALTEC AC30-101B (Millersport data centre) Filed | Large load | 15.4 km | |
| CMH03 Filed | Large load | 16.8 km | |
| Utica Aero Solar Max PV Postponed | Solar | 16.9 km | 12 |
| CyrusOne COL-1 Filed | Large load | 17.4 km | |
| South Site Data Center Energy Center Filed | Large load | 17.5 km | |
| BZI Crane (ECX CMH03) Filed | Large load | 17.8 km | |
| Flint Under construction | Storage | 18.5 km | 200 |
| Vantage OH 12 Filed | Large load | 19.8 km | |
| CMH050 Built | Large load | 20.0 km | |
| CMH082 CAMPUS Built | Large load | 20.3 km | |
| CMH137 Filed | Large load | 20.5 km | |
| Ripley Solar Postponed | Solar | 21.1 km | 100 |
| STACK NAL01B (New Albany data centre) Filed | Large load | 24.6 km |
Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air