Show on map
Desert Quartzite — Power plant · Solar · Desert Quartzite LLCSonoran Energy Project — Postponed · Gas, combined cycle · CA · 553 MW · 5.0 mi awayGrace Energy Center — Contracted · Solar + storage · CA · 500 MW · 6.9 mi awayRio Mesa SEGF 2 — Postponed · Solar thermal · CA · 250 MW · 7.2 mi awayBlythe Solar Power Project — Withdrawn · Solar thermal · CA · 796.8 MW · 7.4 mi awayRio Mesa Solar Facility 1 — Postponed · Solar thermal · CA · 250 MW · 8.0 mi awaySonoran West Solar EGS — Withdrawn · Solar · CA · 540 MW · 8.2 mi awayChuckawalla State Prison — Postponed · Solar · CA · 2.1 MW · 9.8 mi awayIronwood State Prison — Postponed · Solar · CA · 1.1 MW · 10.1 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Desert Quartzite

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
822,859 MWh
Grid
230 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
Desert Quartzite LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805148
Location id
L100000804477
Eia plant ids
59871
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20252,879,421
Capacity factor, 20250.209
Net generation (MWh), 2025822,859
Balancing authority codeCISO

Solar array

Array area (acres)
1,585.7
AC capacity (MW)
300
DC capacity (MW)
374.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sonoran Energy Project Postponed Gas, combined cycle 5.0 mi 553
Grace Energy Center Contracted Solar + storage 6.9 mi 500
Rio Mesa SEGF 2 Postponed Solar thermal 7.2 mi 250
Blythe Solar Power Project Withdrawn Solar thermal 7.4 mi 796.8
Rio Mesa Solar Facility 1 Postponed Solar thermal 8.0 mi 250
Sonoran West Solar EGS Withdrawn Solar 8.2 mi 540
Chuckawalla State Prison Postponed Solar 9.8 mi 2.1
Ironwood State Prison Postponed Solar 10.1 mi 1.1

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO

Attribution