- Combustion
- Wind & solar
- Under construction
- Retired
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Under construction
- Retired
Dinner Lake: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Dinner Lake
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1966
- Location
- Highlands County, Florida
- Operated by
- Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 60 years since 1966
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2003
- Capacity retired
- 12.6 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 12.6 MW | Retired | January 2003 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- NERC region
- SERC
Transmission lines within 15 mi (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 12.6 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Hardee County Solar Farms 1 LLC Postponed | Solar | 10.8 mi | 20 |
| Highland Solar North Under construction | Solar | 14.6 mi | 149.8 |
Sources EIA-860M · Berkeley Lab
Sources
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.