Show on map
Docs Road BESS — Power plant · Storage · North Carolina El Member CorpMcDougald Solar, LLC — Solar · NC · 4.9 MW · 13.7 km away
  • Storage
  • Operating
  • 10 · 100 · 1,000 MW

Docs Road BESS

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-365 MWh
Grid
25 kV to Central Electric Membership Corp. - (NC) (CPLE)
Location
Harnett County, North Carolina
Operated by
North Carolina El Member CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
24.90
Transmission owner
Central Electric Membership Corp. - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-365
Balancing authority codeCPLE
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -365.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
McDougald Solar, LLC Postponed Solar 13.7 km 4.9

Sources EIA-860M

Sources

Attribution