Show on map
Dogfish BESS — Power plant · Storage · Dogfish ESS Assets, LLCBighorn Ridge Solar — Permitted · Solar · TX · 300 MW · 10.9 mi awayOctans — Under construction · Storage · TX · 125 MW · 11.6 mi awaySelenite Springs Solar — Contracted · Solar · TX · 253 MW · 13.3 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Dogfish BESS

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
138 kV to Texas-New Mexico Power Co (ERCO)
Location
Pecos County, Texas
Operated by
Dogfish ESS Assets, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-5,600
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -5600.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bighorn Ridge Solar Permitted Solar 10.9 mi 300
Octans Under construction Storage 11.6 mi 125
Selenite Springs Solar Contracted Solar 13.3 mi 253

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution