Show on map
Donald Von Raesfeld Power Plant — Power plant · Gas, combined cycle · City of Santa Clara - (CA)Kifer BESS 1 — Under construction · Storage · CA · 50 MW · 0.1 mi away4054 Digital Realty — Built · Large load · CA · 0.3 mi away1200 Memorex Skybox Data Center — Filed · Large load · CA · 0.9 mi awayEdgecore -3580 — Filed · Large load · CA · 0.9 mi awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 0.9 mi awayLBA Data Center West — Filed · Large load · CA · 1.0 mi awayPRIME DATA CENTERS — Built · Large load · CA · 1.0 mi awaySKYBOX DATA CENTER — Built · Large load · CA · 1.0 mi awaySV8 DATA CENTER — Large load · CA · 1.2 mi awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 1.2 mi awaySJC02 & SJC03 DATA CENTER — Large load · CA · 3.5 mi awayDC-N (San Jose data centre) — Filed · Large load · CA · 3.9 mi awayData Center — Filed · Large load · CA · 4.8 mi away888 Ross Data Center — Filed · Large load · CA · 4.8 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 8.0 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 8.6 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 11.1 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 12.9 mi awayCHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER — Large load · CA · 13.4 mi awayEquinix SV-19 - 131 Great Oaks Blvd SJ — Filed · Large load · CA · 13.6 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Donald Von Raesfeld Power Plant

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 57% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2005
Net generation, 2025
771,253 MWh
Grid
115 kV to City of Santa Clara - (CA) (CISO)
Location
Santa Clara County, California

Output

Net generation MWh by year, 2005 to 2026
Fuel burned MMBtu by year, 2005 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
21 years since 2005
Unused energy
578 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
8,136 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
City of Santa Clara (California)
Share pct
100
Gem entity id
E100000002228
Unit ids
G100000401993
Location id
L100000401809
Eia plant ids
56026
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
City of Santa Clara - (CA)
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110058308576
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000310
Fuel burned (MMBtu), 20256,275,008
Capacity factor, 20250.572
Heat rate (Btu/kWh), 20258,136.1
Net generation (MWh), 2025771,253
Balancing authority codeCISO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Santa Clara - (CA) Operator EIA-860M
CITY OF SANTA CLARA CALIFORNIA Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Kifer BESS 1 Under construction Storage 0.1 mi 50
4054 Digital Realty Built Large load 0.3 mi
1200 Memorex Skybox Data Center Filed Large load 0.9 mi
Edgecore -3580 Filed Large load 0.9 mi
EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown Large load 0.9 mi
LBA Data Center West Filed Large load 1.0 mi
PRIME DATA CENTERS Built Large load 1.0 mi
SKYBOX DATA CENTER Built Large load 1.0 mi
SV8 DATA CENTER Unknown Large load 1.2 mi
VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown Large load 1.2 mi
SJC02 & SJC03 DATA CENTER Unknown Large load 3.5 mi
DC-N (San Jose data centre) Filed Large load 3.9 mi
Data Center Filed Large load 4.8 mi
888 Ross Data Center Filed Large load 4.8 mi
Fremont CA AutoFactory Under construction Solar 8.0 mi 3.8
Waste Management Tri-Cities LFGTE Postponed Biomass 8.6 mi 4.8
7999 Gateway Solar Under construction Solar 11.1 mi 4.6
Gateway#1&2 (Newark CA) Announced Solar 12.9 mi 1.1
CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER Unknown Large load 13.4 mi
Equinix SV-19 - 131 Great Oaks Blvd SJ Filed Large load 13.6 mi

Sources CAISO · EIA-860M · FAA OE/AAA · EPA ICIS-NPDES · EPA ICIS-Air

Sources

  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Attribution