Show on map
Dulles — Power plant · Solar · Golden Springs Development Company LLCSolar Photovoltaic Project #12 — Solar · CA · 0.5 MW · 4.3 km awaySolar Photovoltaic Project #14 — Solar · CA · 1.5 MW · 4.4 km awaySolar Photovoltaic Project #08 — Solar · CA · 0.5 MW · 4.5 km awaySolar Photovoltaic Project #04 — Solar · CA · 1.5 MW · 4.6 km awaySolar Photovoltaic Project #17 — Solar · CA · 0.5 MW · 4.9 km awaySolar Photovoltaic Project #10 — Solar · CA · 0.5 MW · 5.0 km awaySolar Photovoltaic Project #09 — Solar · CA · 0.5 MW · 5.2 km awayRoadhouse Energy Center — Storage · CA · 300 MW · 5.4 km awaySolar Photovoltaic Project #23 — Solar · CA · 0.5 MW · 5.6 km awaySolar Photovoltaic Project #18 — Solar · CA · 0.5 MW · 5.9 km awaySolar Photovoltaic Project #21 — Solar · CA · 2.5 MW · 6.0 km awaySolar Photovoltaic Project #19 — Solar · CA · 5 MW · 6.3 km awaySolar Photovoltaic Project #31 — Solar · CA · 1 MW · 7.7 km awaySolar Photovoltaic Project #30 — Solar · CA · 1.5 MW · 9.3 km awayCA Riverside 2356 Fleetwood Dr. — Solar + storage · CA · 4 MW · 12.8 km awayCA Bloomington 2551 S Lilac Avenue Micro — Solar + storage · CA · 3 MW · 13.2 km awaySolar Photovoltaic Project #24 — Solar · CA · 4 MW · 13.4 km awaySolar Photovoltaic Project #25 — Solar · CA · 4.5 MW · 14.2 km awaySolar Photovoltaic Project #27 — Solar · CA · 1 MW · 14.3 km awayOES Biogas Power — Biomass · CA · 2.6 MW · 22.4 km awaySolar Photovoltaic Project #28 — Solar · CA · 0.5 MW · 23.5 km away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 9% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
1,644 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
Golden Springs Development Company LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815481
Location id
L100000812821
Eia plant ids
60182
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20255,608
Capacity factor, 20250.094
Net generation (MWh), 20251,644
Balancing authority codeCISO

Solar array

Array area (acres)
8
AC capacity (MW)
2
DC capacity (MW)
2.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #12 Postponed Solar 4.3 km 0.5
Solar Photovoltaic Project #14 Postponed Solar 4.4 km 1.5
Solar Photovoltaic Project #08 Postponed Solar 4.5 km 0.5
Solar Photovoltaic Project #04 Postponed Solar 4.6 km 1.5
Solar Photovoltaic Project #17 Postponed Solar 4.9 km 0.5
Solar Photovoltaic Project #10 Postponed Solar 5.0 km 0.5
Solar Photovoltaic Project #09 Postponed Solar 5.2 km 0.5
Roadhouse Energy Center Contracted Storage 5.4 km 300
Solar Photovoltaic Project #23 Postponed Solar 5.6 km 0.5
Solar Photovoltaic Project #18 Postponed Solar 5.9 km 0.5
Solar Photovoltaic Project #21 Postponed Solar 6.0 km 2.5
Solar Photovoltaic Project #19 Postponed Solar 6.3 km 5
Solar Photovoltaic Project #31 Postponed Solar 7.7 km 1
Solar Photovoltaic Project #30 Postponed Solar 9.3 km 1.5
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 12.8 km 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 13.2 km 3
Solar Photovoltaic Project #24 Postponed Solar 13.4 km 4
Solar Photovoltaic Project #25 Postponed Solar 14.2 km 4.5
Solar Photovoltaic Project #27 Postponed Solar 14.3 km 1
OES Biogas Power Under construction Biomass 22.4 km 2.6
Solar Photovoltaic Project #28 Postponed Solar 23.5 km 0.5

Sources EIA-860M · CAISO

Sources

Attribution