Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
East Tennessee Gas Co: route and 23 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
East Tennessee Gas Co
Gas pipeline · interstate
Key facts
Gas pipeline · interstate Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- Class
- interstate
- States crossed
- US-GA, US-NC, US-TN, US-VA
- Operated by
- East Tennessee Gas CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Pipeline class
- interstate
- Mapped route length (miles)
- 997Two lengthsMapped route length is this pipeline’s route as mapped (EIA Energy Atlas); onshore transmission miles under Attributes is what the operator reported to PHMSA for 2025 for its whole onshore gas transmission system, so the two need not agree.
- Technology
- Interstate source: “Interstate”
- Units
- 108
All 5 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
| Attribute | Value |
|---|---|
| PHMSA operator annual report |
|
| Mapped parts | 33 |
| Status, as the source states it | Operating |
| Mapped segments | 108 |
| Source release | 202001 |
Data notes (1)
- Significant incidents, last 5 years not shown: PHMSA's significant flag is published in PHMSA_Pipeline_Safety_Flagged_Incidents.zip, which could not be retrieved; the public incident file carries neither the flag nor the 1984-dollar cost its definition uses
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Vonore Battery Energy Storage System Under construction | Storage | 0.0 mi | 20 |
| ARCHER DATACENTER NSH I-1 Built | Large load | 0.1 mi | |
| Gallatin Data Center Filed | Large load | 0.4 mi | |
| Franklin (TN) Postponed | Gas, combined cycle | 1.3 mi | 510 |
| Issa Solar Postponed | Solar + storage | 1.4 mi | 300 |
| Hecate Energy Pulaski 1 Filed | Solar | 1.5 mi | 150 |
| SR Tullahoma Under construction | Solar | 2.5 mi | 200 |
| CPV Smyth Generation Company LLC Postponed | Gas, combined cycle | 2.6 mi | 1,017 |
| Salem VA BESS 1 Under construction | Storage | 3.1 mi | 4 |
| May Solar Postponed | Solar + storage | 3.3 mi | 300 |
| Poplar Camp Wind Farm Postponed | Wind | 3.7 mi | 72 |
| SR Copeland Permitted | Solar | 6.8 mi | 110 |
| Kingston Announced | Gas, combined cycle | 7.4 mi | 1,830.6 |
| Axton Solar Filed | Solar | 7.7 mi | 201.1 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION Built | Large load | 9.7 mi | |
| DP FACILITIES INC SOUTH LLC Built | Large load | 11.0 mi | |
| Hawkins Solar Postponed | Solar | 12.3 mi | 5 |
| Mayodan Farm Postponed | Solar | 13.7 mi | 5 |
| Reidsville Energy Center Postponed | Gas, combined cycle | 13.7 mi | 543.9 |
| Sandy Ridge Solar Farm Postponed | Solar | 14.0 mi | 5 |
| Pinewood Solar Center LLC Postponed | Solar | 14.3 mi | 5 |
| Flannagan Hydroelectric Project Postponed | Hydro | 14.4 mi | 1.6 |
| Ostrich Farm Postponed | Solar | 14.6 mi | 5 |
Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · Virginia DEQ · EPA ICIS-Air
Sources
- EIA-860M
- EPA ICIS-NPDES
- FAA OE/AAA
- Virginia DEQSource: Virginia Department of Environmental Quality
- EPA ICIS-Air