Show on map
East Tennessee Gas Co — Gas pipeline · East Tennessee Gas CoVonore Battery Energy Storage System — Under construction · Storage · TN · 20 MW · 0.0 mi awayARCHER DATACENTER NSH I-1 — Built · Large load · TN · 0.1 mi awayGallatin Data Center — Filed · Large load · TN · 0.4 mi awayFranklin (TN) — Postponed · Gas, combined cycle · TN · 510 MW · 1.3 mi awayIssa Solar — Postponed · Solar + storage · VA · 300 MW · 1.4 mi awayHecate Energy Pulaski 1 — Filed · Solar · VA · 150 MW · 1.5 mi awaySR Tullahoma — Under construction · Solar · TN · 200 MW · 2.5 mi awayCPV Smyth Generation Company LLC — Postponed · Gas, combined cycle · VA · 1,017 MW · 2.6 mi awaySalem VA BESS 1 — Under construction · Storage · VA · 4 MW · 3.1 mi awayMay Solar — Postponed · Solar + storage · VA · 300 MW · 3.3 mi awayPoplar Camp Wind Farm — Postponed · Wind · VA · 72 MW · 3.7 mi awaySR Copeland — Permitted · Solar · TN · 110 MW · 6.8 mi awayKingston — Announced · Gas, combined cycle · TN · 1,830.6 MW · 7.4 mi awayAxton Solar — Filed · Solar · VA · 201.1 MW · 7.7 mi awayNORTHROP GRUMMAN SYSTEMS CORPORATION — Built · Large load · VA · 9.7 mi awayDP FACILITIES INC SOUTH LLC — Built · Large load · VA · 11.0 mi awayHawkins Solar — Postponed · Solar · NC · 5 MW · 12.3 mi awayMayodan Farm — Postponed · Solar · NC · 5 MW · 13.7 mi awayReidsville Energy Center — Postponed · Gas, combined cycle · NC · 543.9 MW · 13.7 mi awaySandy Ridge Solar Farm — Postponed · Solar · NC · 5 MW · 14.0 mi awayPinewood Solar Center LLC — Postponed · Solar · NC · 5 MW · 14.3 mi awayFlannagan Hydroelectric Project — Postponed · Hydro · VA · 1.6 MW · 14.4 mi awayOstrich Farm — Postponed · Solar · NC · 5 MW · 14.6 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

East Tennessee Gas Co

Gas pipeline · interstate

Key facts

Gas pipeline · interstate Operating
Mapped route length
Mapped route length: sourceEIA Energy Atlas · Open licensemiles
Class
interstate
States crossed
US-GA, US-NC, US-TN, US-VA
Operated by
East Tennessee Gas CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Pipeline class
interstate
Mapped route length (miles)
997Two lengthsMapped route length is this pipeline’s route as mapped (EIA Energy Atlas); onshore transmission miles under Attributes is what the operator reported to PHMSA for 2025 for its whole onshore gas transmission system, so the two need not agree.
Technology
Interstate source: “Interstate”
Units
108
All 5 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Attributes
AttributeValue
PHMSA operator annual report
PHMSA operator ID
4070
Report year
2025
Operator, as PHMSA names it
EAST TENNESSEE NATURAL GAS, LLC
Years with an incident
2021, 2022, 2023, 2024, 2025
Miles by decade installed
1950s
647.9
1960s
170.4
1970s
44.56
1980s
100.5
1990s
128.4
2000s
356.9
2010s
61
2020s
28.97
Miles by diameter (inches)
6
101.9
8
241.2
10
35.60
12
324.3
14
0.010
16
186.2
18
0.010
20
123.5
22
158.4
24
262.3
26
0.010
28
0.030
30
0.020
Other
0.640
4 or less
104.5
Incidents, last 5 years
1
Incidents with an injury, last 5 years
0
Incidents with a fatality, last 5 years
0
Incidents with ignition, last 5 years
0
Onshore transmission miles
1,538.6
Incidents with an explosion, last 5 years
0
Mapped parts33
Status, as the source states itOperating
Mapped segments108
Source release202001
Data notes (1)
  • Significant incidents, last 5 years not shown: PHMSA's significant flag is published in PHMSA_Pipeline_Safety_Flagged_Incidents.zip, which could not be retrieved; the public incident file carries neither the flag nor the 1984-dollar cost its definition uses

Around this pipeline

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vonore Battery Energy Storage System Under construction Storage 0.0 mi 20
ARCHER DATACENTER NSH I-1 Built Large load 0.1 mi
Gallatin Data Center Filed Large load 0.4 mi
Franklin (TN) Postponed Gas, combined cycle 1.3 mi 510
Issa Solar Postponed Solar + storage 1.4 mi 300
Hecate Energy Pulaski 1 Filed Solar 1.5 mi 150
SR Tullahoma Under construction Solar 2.5 mi 200
CPV Smyth Generation Company LLC Postponed Gas, combined cycle 2.6 mi 1,017
Salem VA BESS 1 Under construction Storage 3.1 mi 4
May Solar Postponed Solar + storage 3.3 mi 300
Poplar Camp Wind Farm Postponed Wind 3.7 mi 72
SR Copeland Permitted Solar 6.8 mi 110
Kingston Announced Gas, combined cycle 7.4 mi 1,830.6
Axton Solar Filed Solar 7.7 mi 201.1
NORTHROP GRUMMAN SYSTEMS CORPORATION Built Large load 9.7 mi
DP FACILITIES INC SOUTH LLC Built Large load 11.0 mi
Hawkins Solar Postponed Solar 12.3 mi 5
Mayodan Farm Postponed Solar 13.7 mi 5
Reidsville Energy Center Postponed Gas, combined cycle 13.7 mi 543.9
Sandy Ridge Solar Farm Postponed Solar 14.0 mi 5
Pinewood Solar Center LLC Postponed Solar 14.3 mi 5
Flannagan Hydroelectric Project Postponed Hydro 14.4 mi 1.6
Ostrich Farm Postponed Solar 14.6 mi 5

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · Virginia DEQ · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Attribution