- Other infrastructure
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
- Other companies nearby
1 asset
1 asset. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
East Tennessee Gas Co
Gas pipeline operator
Key facts
Gas pipeline operator · 997 miles- Pipeline and line held
- 997miles
- Assets
- 1
- States
- GA, NC, TN, VA
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets 1
Assets
1
- Gas pipeline: 1 assets, 1 asset
Operates 1 gas pipeline
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | Miles. Sort by length, largest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| East Tennessee Gas Co | Gas pipeline | Operates | 997 miles | US-GA, US-NC, US-TN, US-VA | East Tennessee Gas Co |
Sources EIA Energy Atlas
Sources 1
Registers
1
Reuse terms
- 1 Open license
Latest read
2026-11-13
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA Energy Atlas ·
EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
US federal work — public domain; EIA copyright/reuse page quoted in docs/13-legal-data-rights.md section 2.11 (retrieved 2026-09-15) asks that EIA be cited as the source. The dataset-level licenseInfo field on the Atlas item was not retrieved (the Hub catalogue API returned no row for the slug, 2026-09-15); read it in a browser before the layer ships
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 4
within 15 miProjects
4
of 23 before the technology filter
Nearest
1.3 mi
Franklin (TN)
4 of 23 · gas-related technologiesNearbyShowing 4 of 23 nearby projects, narrowed to gas-related technologies because this company operates gas infrastructure. Show all 23
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Franklin (TN) | Gas, combined cycle | 510 MW | 1.3 mi away | nearest: East Tennessee Gas Co |
| Postponed | CPV Smyth Generation Company LLC | Gas, combined cycle | 1,017 MW | 2.6 mi away | nearest: East Tennessee Gas Co |
| Announced | Kingston | Gas, combined cycle | 1,830.6 MW | 7.4 mi away | nearest: East Tennessee Gas Co |
| Postponed | Reidsville Energy Center | Gas, combined cycle | 543.9 MW | 13.7 mi away | nearest: East Tennessee Gas Co |
Sources EIA-860M