East Tennessee Gas Co — Gas pipeline · East Tennessee Gas CoFranklin (TN) — Postponed · Gas, combined cycle · TN · 510 MW · 1.3 mi awayCPV Smyth Generation Company LLC — Postponed · Gas, combined cycle · VA · 1,017 MW · 2.6 mi awayKingston — Announced · Gas, combined cycle · TN · 1,830.6 MW · 7.4 mi awayReidsville Energy Center — Postponed · Gas, combined cycle · NC · 543.9 MW · 13.7 mi away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

East Tennessee Gas Co

Follow this company

Gas pipeline operator

Key facts

Gas pipeline operator · 997 miles
Pipeline and line held
997miles
Assets
1
States
GA, NC, TN, VA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Gas pipeline: 1 assets, 1 asset

Operates 1 gas pipeline

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z Miles. Sort by length, largest first State. Sort by state, A to Z Held by
East Tennessee Gas Co Gas pipeline Operates 997 miles US-GA, US-NC, US-TN, US-VA East Tennessee Gas Co

Sources EIA Energy Atlas

Sources

Every source and license · Attribution

Around this company

Nearby 4

within 15 mi

Projects

4

of 23 before the technology filter

Nearest

1.3 mi

Franklin (TN)

4 of 23 · gas-related technologiesNearbyShowing 4 of 23 nearby projects, narrowed to gas-related technologies because this company operates gas infrastructure. Show all 23

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Franklin (TN) Gas, combined cycle 510 MW 1.3 mi away nearest: East Tennessee Gas Co
Postponed CPV Smyth Generation Company LLC Gas, combined cycle 1,017 MW 2.6 mi away nearest: East Tennessee Gas Co
Announced Kingston Gas, combined cycle 1,830.6 MW 7.4 mi away nearest: East Tennessee Gas Co
Postponed Reidsville Energy Center Gas, combined cycle 543.9 MW 13.7 mi away nearest: East Tennessee Gas Co

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution