Show on map
Eastshore 115 kV line — Transmission lineHAYWARD DATA CENTER — Large load · CA · 0.2 mi awaySan Leandro 10 - sleba702 — Under construction · Solar · CA · 1 MW · 3.2 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 6.5 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 8.3 mi awayDynegy Oakland Power Plant — Announced · Storage · CA · 43.3 MW · 10.9 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 11.3 mi awaySan Francisco Intl Airport Ct Project — Postponed · Gas, combustion turbine · CA · 48 MW · 12.5 mi awayBishop Ranch - BR 3-HH — Under construction · Solar + storage · CA · 1.4 MW · 12.8 mi awayBishop Ranch - BR 3-GG — Under construction · Solar + storage · CA · 1.9 MW · 12.8 mi awayBishop Ranch - BR 3-FF — Under construction · Solar + storage · CA · 1.4 MW · 12.8 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 13.1 mi awaySan Francisco Electric Reliability Proj — Withdrawn · Gas, combustion turbine · CA · 151.5 MW · 14.5 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Eastshore 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Eastshore
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID306585
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
HAYWARD DATA CENTER Unknown Large load 0.2 mi
San Leandro 10 - sleba702 Under construction Solar 3.2 mi 1
Gateway#1&2 (Newark CA) Announced Solar 6.5 mi 1.1
7999 Gateway Solar Under construction Solar 8.3 mi 4.6
Dynegy Oakland Power Plant Announced Storage 10.9 mi 43.3
Waste Management Tri-Cities LFGTE Postponed Biomass 11.3 mi 4.8
San Francisco Intl Airport Ct Project Postponed Gas, combustion turbine 12.5 mi 48
Bishop Ranch - BR 3-HH Under construction Solar + storage 12.8 mi 1.4
Bishop Ranch - BR 3-GG Under construction Solar + storage 12.8 mi 1.9
Bishop Ranch - BR 3-FF Under construction Solar + storage 12.8 mi 1.4
Fremont CA AutoFactory Under construction Solar 13.1 mi 3.8
San Francisco Electric Reliability Proj Withdrawn Gas, combustion turbine 14.5 mi 151.5

Sources EPA ICIS-NPDES · EIA-860M · CAISO

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution