Show on map
EKS Landfill — Power plant · Biomass · WM Renewable Energy LLCBlack Dog — Postponed · Gas, combined cycle · MN · 760 MW · 3.6 mi awayBlue Lake BESS — Under construction · Storage · MN · 135.5 MW · 5.8 mi awayIRON GATE DATA CENTERS - EAGAN — Built · Large load · MN · 8.2 mi awayDATABANK - EAGAN - MSP2 — Built · Large load · MN · 9.0 mi awayFIS GLOBAL — Built · Large load · MN · 10.3 mi awayEAGAN 5 MW DATA CENTER — Built · Large load · MN · 10.3 mi awayJIMNIST LLC — Built · Large load · MN · 12.9 mi awayDakota Solar — Postponed · Solar · MN · 3 MW · 13.8 mi awayGladiolus Solar, LLC — Postponed · Solar · MN · 1 MW · 14.5 mi awaySUPERCOMPUTER LLC — Built · Large load · MN · 14.6 mi away
  • Storage
  • Bioenergy
  • Loads
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

EKS Landfill

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1994
Net generation, 2022
0 MWh
Grid
14 kV to Northern States Power Co - Minnesota (MISO)
Location
Dakota County, Minnesota

Output

Net generation MWh by year, 2002 to 2022
Fuel burned MMBtu by year, 2002 to 2022
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
32 years since 1994
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110008820035
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007743
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2020
First unit retired
March 2007
Capacity retired
5.7 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNT3Landfill Gas0.9 MWRetiredMarch 2007
UNT1Landfill Gas1.6 MWRetiredDecember 2020
UNT2Landfill Gas1.6 MWRetiredDecember 2020
UNT4Landfill Gas1.6 MWRetiredDecember 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Northern States Power Co - Minnesota
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
WM Renewable Energy LLC Operator EIA-860M
WASTE MANAGEMENT INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units UNT1, UNT2, UNT4 scheduled to retire, 4.8 MW · EIA-860M
  • Stated Unit UNT3 scheduled to retire, 0.9 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Black Dog Postponed Gas, combined cycle 3.6 mi 760
Blue Lake BESS Under construction Storage 5.8 mi 135.5
IRON GATE DATA CENTERS - EAGAN Built Large load 8.2 mi
DATABANK - EAGAN - MSP2 Built Large load 9.0 mi
FIS GLOBAL Built Large load 10.3 mi
EAGAN 5 MW DATA CENTER Built Large load 10.3 mi
JIMNIST LLC Built Large load 12.9 mi
Dakota Solar Postponed Solar 13.8 mi 3
Gladiolus Solar, LLC Postponed Solar 14.5 mi 1
SUPERCOMPUTER LLC Built Large load 14.6 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution