El Segundo Cogen — Power plant · Gas, combined cycle · Chevron USA Inc-El SegundoScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 1.6 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 6.5 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 11.0 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 11.0 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 11.1 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 11.1 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 11.1 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 11.7 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 11.9 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 14.0 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 14.2 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

El Segundo Cogen

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 77% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1987
Net generation, 2025
1,216,454 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
39 years since 1987
Unused energy
361 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,069 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Chevron Corp
Share pct
100
Gem entity id
E100000001179
Unit ids
G100000401588
Location id
L100000401650
Eia plant ids
10213
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002899908
Subparts reported
C, P, PP, Y
NAICS code
324110
Subpart PP (CO2 supply)
Yes
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007978
Fuel burned (MMBtu), 202514,681,445
Capacity factor, 20250.771
Heat rate (Btu/kWh), 202512,069.1
Net generation (MWh), 20251,216,454.0
Balancing authority codeCISO

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Chevron USA Inc-El Segundo Operator EIA-860M
Chevron Owner 100.0% Dec 31, 2023 EPA GHGRP
Chevron U.S.A., Inc. Owner 74.5% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Scattergood Postponed Gas, combined cycle 1.6 mi 346
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 6.5 mi 1.4
Watson Cogeneration Withdrawn Gas, combined cycle 11.0 mi 94.2
Dominguez - SLLAX512 Under construction Solar 11.0 mi 1.3
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 11.1 mi 1.3
Fordyce - SLLAX680 Under construction Solar 11.1 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 11.1 mi 1.2
LATTC South Campus Solar Postponed Solar 11.7 mi 1.1
PRIME DATA CENTER VERNON Built Large load 11.9 mi
San Pedro Public Market (SPPM) Under construction Solar 14.0 mi 1.2
Elevate Pier S Filed Storage 14.2 mi 70

Sources EIA-860M · CAISO · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO