Show on map
El Segundo Power — Power plant · Gas, steam turbine · NRG El Segundo Operations IncScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 0.6 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 7.6 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 12.1 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 12.2 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 12.3 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 12.3 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 12.3 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 12.4 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 12.7 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

El Segundo Power

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 2% of 2015 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1955
Net generation, 2015
144,279 MWh
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2015
Fuel burned MMBtu by year, 2001 to 2015
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
71 years since 1955
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000520213
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000431
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2015
First unit retired
December 2002
Capacity retired
996.4 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine156.2 MWRetiredDecember 2002
2Natural Gas Steam Turbine156.2 MWRetiredDecember 2002
3Natural Gas Steam Turbine342 MWRetiredJuly 2013
4Natural Gas Steam Turbine342 MWRetiredDecember 2015

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
NRG El Segundo Operations Inc Operator EIA-860M
Clearway Energy, Inc Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit 4 scheduled to retire, 342 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 342 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 312.4 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Scattergood Postponed Gas, combined cycle 0.6 mi 346
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 7.6 mi 1.4
Watson Cogeneration Withdrawn Gas, combined cycle 12.1 mi 94.2
Dominguez - SLLAX512 Under construction Solar 12.2 mi 1.3
LATTC South Campus Solar Postponed Solar 12.3 mi 1.1
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 12.3 mi 1.3
Fordyce - SLLAX680 Under construction Solar 12.3 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 12.4 mi 1.2
PRIME DATA CENTER VERNON Built Large load 12.7 mi
San Pedro Public Market (SPPM) Under construction Solar 14.9 mi 1.2

Sources EIA-860M · CAISO · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution