Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
Faison Solar: location and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Faison Solar
Power plant · Solar
Key facts
Power plant · Solarran 10% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2015
- Net generation, 2025
- 1,732 MWh
- Grid
- 23 kV to Duke Energy Progress - (NC) (CPLE)
- Location
- Duplin County, North Carolina
- Operated by
- USF Surry, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 5,910 |
| Capacity factor, 2025 | 0.099 |
| Net generation (MWh), 2025 | 1,732 |
| Balancing authority code | CPLE |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 8.3
- AC capacity (MW)
- 2
- DC capacity (MW)
- 2.2
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2015
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Angus Holdings Postponed | Solar | 5.0 km | 5 |
| Faison Farm Postponed | Solar | 6.1 km | 5 |
| Warsaw 2 Energy Storage Under construction | Storage | 7.3 km | 11 |
| Panther Branch Solar, LLC Filed | Solar + storage | 9.3 km | 112 |
| Calypso Farm Postponed | Solar | 9.3 km | 5 |
| FibroCoast Postponed | Biomass | 9.4 km | 60 |
| Innovative Solar 38 Postponed | Solar | 17.3 km | 34 |
| Holger Holdings Postponed | Solar | 21.0 km | 5 |
Sources EIA-860M