Show on map
Panther Branch Solar, LLCFaison Farm — Postponed · Solar · NC · 5 MW · 2.3 mi awayCalypso Farm — Postponed · Solar · NC · 5 MW · 2.4 mi awayFibroCoast — Postponed · Biomass · NC · 60 MW · 2.7 mi awayAngus Holdings — Postponed · Solar · NC · 5 MW · 8.8 mi awayWarsaw 2 Energy Storage — Under construction · Storage · NC · 11 MW · 10.1 mi awayRoady Lane Farm LLC — Postponed · Solar · NC · 74.8 MW · 12.4 mi awayBradley Farm (Dudley) — Postponed · Solar · NC · 5 MW · 12.5 mi awayInnovative Solar 38 — Postponed · Solar · NC · 34 MW · 14.1 mi awayStevens Mill Solar — Filed · Solar · NC · 80 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Panther Branch Solar, LLC

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Carolinas (DUK)
In-service date
(stated)
Location
Duplin County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
112 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
66385 2 generatorsEIA generatorsPlant 66385 GEN1, GEN1B

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as filed in EIA-860M (source status: “(L) Regulatory approvals pending. Not under construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Faison Farm Postponed Solar 2.3 mi 5
Calypso Farm Postponed Solar 2.4 mi 5
FibroCoast Postponed Biomass 2.7 mi 60
Angus Holdings Postponed Solar 8.8 mi 5
Warsaw 2 Energy Storage Under construction Storage 10.1 mi 11
Roady Lane Farm LLC Postponed Solar 12.4 mi 74.8
Bradley Farm (Dudley) Postponed Solar 12.5 mi 5
Innovative Solar 38 Postponed Solar 14.1 mi 34
Stevens Mill Solar Filed Solar 14.7 mi 80

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution