Show on map
Federal Road Solar 1, LLC CSG — Power plant · Solar · Federal Road Solar 1, LLCSolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 1.9 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 3.3 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 8.3 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 8.3 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 8.5 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 9.3 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 9.3 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 9.4 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 9.5 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 10.1 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 11.1 mi awayCanal — Postponed · Gas, combustion turbine · MA · 330 MW · 11.4 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 11.7 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Federal Road Solar 1, LLC CSG

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
8,276 MWh
Grid
23 kV to NSTAR Electric Company (ISNE)
Location
Plymouth County, Massachusetts
Operated by
Federal Road Solar 1, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
11 years since 2015
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815651
Location id
L100000812981
Eia plant ids
60065
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
22.80
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202528,235
Capacity factor, 20250.215
Net generation (MWh), 20258,276
Balancing authority codeISNE

Solar array

Array area (acres)
25.4
AC capacity (MW)
4.4
DC capacity (MW)
6
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Carver 1 Hybrid Under construction Solar + storage 1.9 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 3.3 mi 2
Logging Swamp South Permitted Solar 8.3 mi 5
Logging Swamp North Permitted Solar 8.3 mi 5
Snipatuit Road Solar Under construction Solar + storage 8.5 mi 8
Cushman Road Solar Filed Solar + storage 9.3 mi 6
Featherbed Lane South Solar Under construction Solar + storage 9.3 mi 2
Braley Hill North Solar Under construction Solar + storage 9.4 mi 10
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 9.5 mi 4.5
Clems Way Solar Permitted Solar 10.1 mi 5
MA Acushnet 540R Main St Filed Solar + storage 11.1 mi 6
Canal Postponed Gas, combustion turbine 11.4 mi 330
Randall Lane Solar Under construction Solar + storage 11.7 mi 10

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution