FirstEnergy R Paul Smith Power Station — Power plant · Coal · Allegheny Energy Supply Co LLCDownsville II — Under construction · Solar · MD · 2 MW · 2.5 mi awayBedington Energy Facility, LLC — Filed · Solar · WV · 100 MW · 5.4 mi awayESS Wesel — Postponed · Storage · MD · 6 MW · 5.6 mi awayESS Fairgrounds — Postponed · Storage · MD · 4 MW · 7.4 mi awayMason Dixon Solar Center — Postponed · Solar · MD · 20 MW · 9.4 mi awayWVA1 DC1 (Martinsburg data centre) — Filed · Large load · WV · 13.4 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

FirstEnergy R Paul Smith Power Station

Power plant · Coal

Key facts

Power plant · Coalran 9% of 2012 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1947
Net generation, 2012
84,462 MWh
Location
Washington County, Maryland

Output

Net generation MWh by year, 2001 to 2012
Fuel burned MMBtu by year, 2001 to 2012
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
79 years since 1947
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
FirstEnergy Corp
Share pct
100
Gem entity id
E100001001053
Unit ids
G100000108413, G100000108414
Location id
L100000103968
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110022381545
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000648
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2012
Capacity retired
109.5 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
11Conventional Steam Coal75 MWRetiredSeptember 2012
9Conventional Steam Coal34.5 MWRetiredSeptember 2012

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

4 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Allegheny Energy Supply Co LLC Operator EIA-860M
FirstEnergy Generation Corp Owner 50.0% Dec 31, 2023 EPA GHGRP
Allegheny Energy Owner 50.0% Dec 31, 2023 EPA GHGRP
FirstEnergy Generation, LLC Owner 50.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 11, 9 scheduled to retire, 109.5 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Downsville II Under construction Solar 2.5 mi 2
Bedington Energy Facility, LLC Filed Solar 5.4 mi 100
ESS Wesel Postponed Storage 5.6 mi 6
ESS Fairgrounds Postponed Storage 7.4 mi 4
Mason Dixon Solar Center Postponed Solar 9.4 mi 20
WVA1 DC1 (Martinsburg data centre) Filed Large load 13.4 mi

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026