Show on map
- Storage
- Operating
- 10 · 100 · 1,000 MW
Map
- Storage
- Operating
Five Points BESS: location and 3 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Five Points BESS
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- -406 MWh
- Grid
- 13 kV to Randolph Electric Member Corp (CPLE)
- Location
- Randolph County, North Carolina
- Operated by
- North Carolina El Member CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -406 |
| Balancing authority code | CPLE |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -406.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Maverick Solar Postponed | Solar | 12.0 km | 3 |
| Westside Solar Farm Postponed | Solar | 17.7 km | 4 |
| North Siler Farm Postponed | Solar | 22.2 km | 5 |