Show on map
Four Mile Canyon Windfarm LLC — Power plant · Wind · Echo 2Sunstone Solar — Filed · Solar + storage · OR · 2,400 MW · 5.9 mi awayWheatridge Optimization I — Under construction · Solar + storage · OR · 175 MW · 10.1 mi awayWheatridge Optimization II — Under construction · Solar + storage · OR · 190 MW · 10.3 mi awayTutuilla Solar — Under construction · Solar · OR · 1.6 MW · 11.2 mi awayPerennial Wind Chaser Station — Postponed · Gas, combustion turbine · OR · 424 MW · 11.6 mi awayPDX 245 Campus-Water Tank/Auxiliary Buidling — Filed · Large load · OR · 14.5 mi awayAMAZON DATA SERVICES, INC. — Built · Large load · OR · 14.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Four Mile Canyon Windfarm LLC

Power plant · Wind

Key facts

Power plant · Windran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
20,375 MWh
Grid
69 kV to PacifiCorp (PACW)
Location
Morrow County, Oregon
Operated by
Echo 2SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2009 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
17 years since 2009
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
PacifiCorp
Balancing authority code
PACW
Balancing authority name
PacifiCorp - West
Fuel burned (MMBtu), 202569,519
Capacity factor, 20250.233
Net generation (MWh), 202520,375
Balancing authority codePACW

Wind turbines

Turbines
5
Turbine capacity (MW)
10
Turbine models
5 REpower MM92
Hub height (m)
80
Rotor diameter (m)
92.5
Year online
2009

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sunstone Solar Filed Solar + storage 5.9 mi 2,400
Wheatridge Optimization I Under construction Solar + storage 10.1 mi 175
Wheatridge Optimization II Under construction Solar + storage 10.3 mi 190
Tutuilla Solar Under construction Solar 11.2 mi 1.6
Perennial Wind Chaser Station Postponed Gas, combustion turbine 11.6 mi 424
PDX 245 Campus-Water Tank/Auxiliary Buidling Filed Large load 14.5 mi
AMAZON DATA SERVICES, INC. Built Large load 14.7 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air

Sources

Attribution