Show on map
FPL Energy Oliver Wind II LLC — Power plant · Wind · FPL Energy Oliver County Wind II LLCRed Butte Wind — Announced · Wind · ND · 202 MW · 14.4 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

FPL Energy Oliver Wind II LLC

Power plant · Wind

Key facts

Power plant · Windran 45% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2007
Net generation, 2025
189,468 MWh
Grid
230 kV to ALLETE, Inc. (MISO)
Location
Oliver County, North Dakota
Operated by
FPL Energy Oliver County Wind II LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2007 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
19 years since 2007
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
230
Transmission owner
ALLETE, Inc.
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 2025646,465
Capacity factor, 20250.451
Net generation (MWh), 2025189,468
Balancing authority codeMISO

Wind turbines

Turbines
32
Turbine capacity (MW)
51.2
Turbine models
32 GE Wind GE1.6-91
Hub height (m)
80
Rotor diameter (m)
91
Year online
2007

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Red Butte Wind Announced Wind 14.4 mi 202

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution