- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
FPL Energy Oliver Wind II LLC: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
FPL Energy Oliver Wind II LLC
Power plant · Wind
Key facts
Power plant · Windran 45% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2007
- Net generation, 2025
- 189,468 MWh
- Grid
- 230 kV to ALLETE, Inc. (MISO)
- Location
- Oliver County, North Dakota
- Operated by
- FPL Energy Oliver County Wind II LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 189,468
MWh - Fuel burned, 2025
- 646,465
MMBtu - Capacity factor, 2025
- 45.1
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 189,468 | 646,465 | 45.1% | — |
| 2024 | 180,941 | 617,370 | 42.9% | — |
| 2023 | 179,943 | 613,968 | 42.8% | — |
| 2022 | 212,913 | 726,460 | 50.6% | — |
| 2021 | 191,994 | 1,697,995 | 45.7% | — |
| 2020 | 177,775 | 1,558,553 | 42.2% | — |
| 2019 | 146,841 | 1,307,620 | 34.9% | — |
| 2018 | 147,446 | 1,342,349 | 35.1% | — |
| 2017 | 172,333 | 1,587,704 | 41.0% | — |
| 2016 | 175,559 | 1,620,761 | 41.6% | — |
| 2015 | 170,000 | 1,584,231 | 40.4% | — |
| 2014 | 185,523 | 1,764,323 | 44.1% | — |
| 2013 | 152,404 | 1,454,087 | 36.2% | — |
| 2012 | 171,502 | 1,632,014 | 40.7% | — |
| 2011 | 184,570 | 1,793,281 | 43.9% | — |
| 2010 | 168,242 | 1,641,370 | 40.0% | — |
| 2009 | 180,517 | 1,761,846 | 42.9% | — |
| 2008 | 192,559 | 1,897,477 | 45.7% | — |
| 2007 | 13,080 | 129,282 | 3.1% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.