Show on map
- Clean firm
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
Franklin (CA): location and 9 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Franklin (CA)
Power plant · Hydro
Key facts
Power plant · Hydro Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1921
- Net generation, 2025
- 0 MWh
- Grid
- 5 kV to Los Angeles Department of Water & Power (LDWP)
- Location
- Los Angeles County, California
- Operated by
- Los Angeles Department of Water & PowerSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 105 years since 1921
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | LDWP |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| AB Van Nuys Announced | Solar | 14.3 km | 1.6 |
| LATTC South Campus Solar Postponed | Solar | 15.4 km | 1.1 |
| Foothill Solar Project Postponed | Solar | 19.9 km | 1.1 |
| PRIME DATA CENTER VERNON Built | Large load | 20.3 km | |
| Scattergood Postponed | Gas, combined cycle | 20.7 km | 346 |
| Scholl Canyon Under construction | Biomass | 21.1 km | 12 |
| 20525 Nordhoff PV (North) Under construction | Solar | 21.3 km | 1.9 |
| Van Norman Bypass Solar Project Postponed | Solar | 21.7 km | 2 |
| Glenarm BESS Plant Filed | Storage | 24.6 km | 25 |