Show on map
Franklin (CA) — Power plant · Hydro · Los Angeles Department of Water & PowerAB Van Nuys — Solar · CA · 1.6 MW · 14.3 km awayLATTC South Campus Solar — Solar · CA · 1.1 MW · 15.4 km awayFoothill Solar Project — Solar · CA · 1.1 MW · 19.9 km awayPRIME DATA CENTER VERNON — Large load · CA · 20.3 km awayScattergood — Gas, combined cycle · CA · 346 MW · 20.7 km awayScholl Canyon — Biomass · CA · 12 MW · 21.1 km away20525 Nordhoff PV (North) — Solar · CA · 1.9 MW · 21.3 km awayVan Norman Bypass Solar Project — Solar · CA · 2 MW · 21.7 km awayGlenarm BESS Plant — Storage · CA · 25 MW · 24.6 km away
  • Clean firm
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Franklin (CA)

Power plant · Hydro

Key facts

Power plant · Hydro Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1921
Net generation, 2025
0 MWh
Grid
5 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California
Operated by
Los Angeles Department of Water & PowerSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
105 years since 1921
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
4.80
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Eia status
By code
OA
Mw
2
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
2
Out of service mw
2
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeLDWP
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
AB Van Nuys Announced Solar 14.3 km 1.6
LATTC South Campus Solar Postponed Solar 15.4 km 1.1
Foothill Solar Project Postponed Solar 19.9 km 1.1
PRIME DATA CENTER VERNON Built Large load 20.3 km
Scattergood Postponed Gas, combined cycle 20.7 km 346
Scholl Canyon Under construction Biomass 21.1 km 12
20525 Nordhoff PV (North) Under construction Solar 21.3 km 1.9
Van Norman Bypass Solar Project Postponed Solar 21.7 km 2
Glenarm BESS Plant Filed Storage 24.6 km 25