Front Range Project — Power plant · Biomass · Timberline Energy LLC
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Front Range Project

Power plant · Biomass

Key facts

Power plant · Biomassran 72% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
20,158 MWh
Grid
12 kV to United Power, Inc (WACM)
Location
Weld County, Colorado
Operated by
Timberline Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
20,158MWh
Fuel burned, 2025
208,361MMBtu
Capacity factor, 2025
71.9%
Heat rate, 2025
10,336Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202520,158208,36171.9%10,336
202418,637198,56766.3%10,654
202310,875128,59538.8%11,825
202213,416168,26347.9%12,542
202117,309213,30961.8%12,324
202019,968265,05871.0%13,274
201920,390250,28472.7%12,275
201821,526253,74176.8%11,788
201722,010280,41778.5%12,740
201623,786254,94284.6%10,718
201522,063276,52878.7%12,534
201423,529285,60883.9%12,139
201324,327293,30486.8%12,057
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)