Front Range Project — Power plant · Biomass · Timberline Energy LLCFront Range Project — Biomass · CO · 1.6 MW · 0.0 km awayJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Large load · CO · 4.9 km awaySpindle BESS — Storage · CO · 199 MW · 11.3 km awayORACLE AMERICA - BROOMFIELD CAMPUS — Large load · CO · 15.7 km awayAMERICAN HONDA MOTORS CO. - DATA CENTER — Large load · CO · 17.1 km awayLOCKHEED MARTIN - DENVER DATA CENTER — Large load · CO · 21.9 km awayCrusoe Brighton Buildout TI — Large load · CO · 24.3 km away
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Front Range Project

Power plant · Biomass

Key facts

Power plant · Biomassran 72% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
20,158 MWh
Grid
12 kV to United Power, Inc (WACM)
Location
Weld County, Colorado
Operated by
Timberline Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2025
Fuel burned MMBtu by year, 2013 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
15 years since 2011
Heat rate
10,336 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
United Power, Inc
Balancing authority code
WACM
Balancing authority name
Western Area Power Administration - Rocky Mountain Region
Fuel burned (MMBtu), 2025208,361
Capacity factor, 20250.719
Heat rate (Btu/kWh), 202510,336.4
Net generation (MWh), 202520,158
Balancing authority codeWACM

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Front Range Project Postponed Biomass 0.0 km 1.6
JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built Large load 4.9 km
Spindle BESS Under construction Storage 11.3 km 199
ORACLE AMERICA - BROOMFIELD CAMPUS Built Large load 15.7 km
AMERICAN HONDA MOTORS CO. - DATA CENTER Built Large load 17.1 km
LOCKHEED MARTIN - DENVER DATA CENTER Built Large load 21.9 km
Crusoe Brighton Buildout TI Filed Large load 24.3 km