Front Range Project
Power plant · Biomass
Key facts
Power plant · Biomassran 72% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 20,158 MWh
- Grid
- 12 kV to United Power, Inc (WACM)
- Location
- Weld County, Colorado
- Operated by
- Timberline Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 15 years since 2011
- Heat rate
- 10,336 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 208,361 |
| Capacity factor, 2025 | 0.719 |
| Heat rate (Btu/kWh), 2025 | 10,336.4 |
| Net generation (MWh), 2025 | 20,158 |
| Balancing authority code | WACM |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Front Range Project Postponed | Biomass | 0.0 km | 1.6 |
| JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built | Large load | 4.9 km | |
| Spindle BESS Under construction | Storage | 11.3 km | 199 |
| ORACLE AMERICA - BROOMFIELD CAMPUS Built | Large load | 15.7 km | |
| AMERICAN HONDA MOTORS CO. - DATA CENTER Built | Large load | 17.1 km | |
| LOCKHEED MARTIN - DENVER DATA CENTER Built | Large load | 21.9 km | |
| Crusoe Brighton Buildout TI Filed | Large load | 24.3 km |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA