- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
FTBLID2: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
FTBLID2
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 882 MWh
- Grid
- 138 kV to CenterPoint Energy (ERCO)
- Location
- Fort Bend County, Texas
- Operated by
- Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 882
MWh - Fuel burned, 2025
- 6,228
MMBtu - Capacity factor, 2025
- 0.9
% - Heat rate, 2025
- 7,061
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 882 | 6,228 | 0.9% | 7,061 |
| 2024 | 130 | 1,835 | 0.1% | 14,115 |
| 2023 | 1,837 | 25,931 | 1.9% | 14,116 |
| 2022 | 1,076 | 15,587 | 1.1% | 14,486 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.