Show on map
FTBLID2 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCImperial Power Plant LLC — Gas, reciprocating engine · TX · 12 MW · 5.2 km awayCrowned Heron 2 - Storage, LLC — Storage · TX · 154.2 MW · 10.4 km awayJack Fusco Energy Center — Gas, combined cycle · TX · 400 MW · 11.4 km awayCallisto II Energy Center — Storage · TX · 303.2 MW · 19.7 km awayPamela Heights I Energy Center — Storage · TX · 101.7 MW · 19.7 km awayRock Rose Energy Storage — Storage · TX · 208.5 MW · 22.2 km away
  • Combustion
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
882 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Fort Bend County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
5 years since 2021
Unused energy
97 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,061 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20256,228
Capacity factor, 20250.009
Heat rate (Btu/kWh), 20257,061.2
Net generation (MWh), 2025882
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Imperial Power Plant LLC Postponed Gas, reciprocating engine 5.2 km 12
Crowned Heron 2 - Storage, LLC Built Storage 10.4 km 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 11.4 km 400
Callisto II Energy Center Under construction Storage 19.7 km 303.2
Pamela Heights I Energy Center Under construction Storage 19.7 km 101.7
Rock Rose Energy Storage Under construction Storage 22.2 km 208.5

Sources EIA-860M · ERCOT

Sources

Attribution