Show on map
Fuyao Glass Illinois Inc. — Power plant · Oil · Fuyao Glass Illinois, IncBTB ENERGY DECATUR IMBODEN DATA CENTER/SOLAR ARRAY — Under construction · Large load · IL · 4.4 mi awayBTB ENERGY DECATUR BRUSH COLLEGE DATA CENTER/SOLAR ARRAY — Under construction · Large load · IL · 6.7 mi away
  • Combustion
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Fuyao Glass Illinois Inc.

Power plant · Oil

Key facts

Power plant · Oil Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1980
Net generation, 2025
0 MWh
Grid
138 kV to Ameren Illinois Company (MISO)
Location
Macon County, Illinois

Output

Net generation MWh by year, 2004 to 2026
Fuel burned MMBtu by year, 2004 to 2026
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
46 years since 1980
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110017422582
Subparts reported
C, N
NAICS code
327211
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1004085
Eia status
By code
SB
Mw
4.70
Units
3
Standby mw
4.70
Status rule
majority_mw_standby
In service mw
4.70
Out of service mw
0
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeMISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

Capacity retired
1.2 MW
Generators retired
1
Capacity still in service
4.7 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1200Petroleum Liquids1.2 MWRetiredDecember 2005

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Ameren Illinois Company
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Fuyao Glass Illinois, Inc Operator EIA-860M
FUYAO GLASS AMERICA INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit 1200 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BTB ENERGY DECATUR IMBODEN DATA CENTER/SOLAR ARRAY Under construction Large load 4.4 mi
BTB ENERGY DECATUR BRUSH COLLEGE DATA CENTER/SOLAR ARRAY Under construction Large load 6.7 mi

Sources EPA ICIS-NPDES

Sources

Attribution