Fuyao Glass Illinois Inc.
Power plant · Oil
Key facts
Power plant · Oil Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1980
- Net generation, 2025
- 0 MWh
- Grid
- 138 kV to Ameren Illinois Company (MISO)
- Location
- Macon County, Illinois
- Operated by
- Fuyao Glass Illinois, Inc
Output
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 46 years since 1980
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | MISO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
- Capacity retired
- 1.2 MW
- Generators retired
- 1
- Capacity still in service
- 4.7 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1200 | Petroleum Liquids | 1.2 MW | Retired | December 2005 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- Ameren Illinois Company
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Fuyao Glass Illinois, Inc | Operator | EIA-860M | ||
| FUYAO GLASS AMERICA INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit 1200 scheduled to retire, 1.2 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| BTB ENERGY DECATUR IMBODEN DATA CENTER/SOLAR ARRAY Under construction | Large load | 4.4 mi | |
| BTB ENERGY DECATUR BRUSH COLLEGE DATA CENTER/SOLAR ARRAY Under construction | Large load | 6.7 mi |
Sources EPA ICIS-NPDES