Show on map
Galena Park 138 kV line — Transmission lineTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 2.5 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 5.2 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 5.5 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 9.5 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 11.2 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 11.9 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 14.4 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 14.4 mi awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 14.6 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Galena Park 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
Galena Park
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID303227
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Texas Petrochemicals Postponed Gas, combined cycle 2.5 mi 560
Greens Bayou 6 Under construction Gas, combustion turbine 5.2 mi 445
TX Houston 7080 Express Lane Postponed Storage 5.5 mi 1.5
TX LaPort 10060 Porter Road Solar Postponed Solar 9.5 mi 1.6
CPV Pondera King Energy Center Postponed Gas, combined cycle 11.2 mi 900
NET Power La Porte Station Studied Gas, combustion turbine 11.9 mi 25.5
Pamela Heights I Energy Center Under construction Storage 14.4 mi 101.7
Callisto II Energy Center Under construction Storage 14.4 mi 303.2
BESS TX Camarine - BSHOU001 Under construction Storage 14.6 mi 9.9

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution