Gates Peaker — Power plant · Gas, combustion turbine · Wellhead Services, Inc.Key Energy Storage — Under construction · Storage · CA · 300.1 MW · 2.3 km awaySand Luis West — Permitted · Solar + storage · CA · 156.3 MW · 8.6 km awayKettleman Solar — Contracted · Solar + storage · CA · 20 MW · 18.3 km awayCherry — Permitted · Solar + storage · CA · 359.7 MW · 20.5 km awayGrape — Under construction · Solar · CA · 246.4 MW · 21.8 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Gates Peaker

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2012
0 MWh
Grid
75 kV to Pacific Gas & Electric Co (CISO)
Location
Fresno County, California

Output

Net generation MWh by year, 2002 to 2013
Fuel burned MMBtu by year, 2002 to 2013
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
25 years since 2001
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110014324052
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000314
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2013
Capacity retired
46.5 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combustion Turbine46.5 MWRetiredJanuary 2013

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
75 kV
Transmission or distribution system owner
Pacific Gas & Electric Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Wellhead Services, Inc. Operator EIA-860M
WELLHEAD POWER GATES, LLC Owner 100.0% Dec 31, 2023 EPA GHGRP
Wellhead Services, Inc. Owner 25.0% Dec 31, 2025 EIA-860
Fresno Power Investors LP Owner 75.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit GEN1 scheduled to retire, 46.5 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Key Energy Storage Under construction Storage 2.3 km 300.1
Sand Luis West Permitted Solar + storage 8.6 km 156.3
Kettleman Solar Contracted Solar + storage 18.3 km 20
Cherry Permitted Solar + storage 20.5 km 359.7
Grape Under construction Solar 21.8 km 246.4

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 11, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution