Show on map
George M Sullivan Generation Plant 2 — Power plant · Gas, combustion turbine · Chugach Electric Assn Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

George M Sullivan Generation Plant 2

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 58% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1979
Net generation, 2025
1,771,617 MWh
Grid
115 kV to Chugach Electric Assn Inc
Location
Anchorage County, Alaska

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
47 years since 1979
Unused energy
1,267 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,521 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071159291
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003493
Eia status
By code
OP
Mw
193.9
Units
3
SB
Mw
153
Units
2
Standby mw
153
Status rule
some_units_retired
In service mw
346.9
Out of service mw
0
Fuel burned (MMBtu), 202513,323,604
Capacity factor, 20250.583
Heat rate (Btu/kWh), 20257,520.6
Net generation (MWh), 20251,771,617

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
71.1 MW
Generators retired
2
Capacity still in service
346.9 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Natural Gas Fired Combined Cycle38.1 MWRetiredDecember 2016
6Natural Gas Fired Combined Cycle33 MWRetiredDecember 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Chugach Electric Assn Inc
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Chugach Electric Assn Inc Operator EIA-860M
CHUGACH ELECTRIC ASSOC INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 5, 6 scheduled to retire, 71.1 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source