George M Sullivan Generation Plant 2 — Power plant · Gas, combustion turbine · Chugach Electric Assn Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

George M Sullivan Generation Plant 2

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 58% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1979
Net generation, 2025
1,771,617 MWh
Grid
115 kV to Chugach Electric Assn Inc
Location
Anchorage County, Alaska

Operations

Net generation, 2025
1,771,617MWh
Fuel burned, 2025
13,323,604MMBtu
Capacity factor, 2025
58.3%
Heat rate, 2025
7,521Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20251,771,61713,323,60458.3%7,521
2024923,2507,168,89530.3%7,765
2023911,2967,550,82330.0%8,286
2022908,5987,529,69229.9%8,287
2021761,3725,928,67325.1%7,787
2020447,4934,014,00614.7%8,970
2019626,1895,428,91320.6%8,670
2018843,3287,076,44427.8%8,391
2017803,8247,264,20226.5%9,037
2016589,7386,509,47919.4%11,038
2015654,1426,793,89721.5%10,386
2014493,7175,644,16016.2%11,432
2013562,2836,216,96818.5%11,057
20121,007,08911,218,64233.1%11,140
20111,082,36111,581,23135.6%10,700
20101,048,41511,153,41934.5%10,638
20091,004,74210,919,11133.1%10,868
20081,149,46711,900,95037.7%10,354
20071,193,35413,004,96639.3%10,898
20061,280,85214,042,26542.1%10,963
2005964,52710,747,50331.7%11,143
20041,002,29911,023,09432.9%10,998
2003812,7538,935,25326.8%10,994
2002739,5187,112,31024.3%9,618
2001806,5938,076,54126.5%10,013
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source