Show on map
Gibbons Creek 345 kV line — Transmission lineBlue Jay Solar I, LLC — Under construction · Solar · TX · 210 MW · 1.9 mi awaySOSA Energy Center — Under construction · Storage · TX · 154.6 MW · 10.4 mi awayTex-Bar ESS — Contracted · Storage · TX · 201.5 MW · 12.0 mi awayPecan Prairie South Solar — Under construction · Solar · TX · 133 MW · 13.3 mi awayCentral Utility Plant - Texas A&M — Announced · Gas, combined cycle · TX · 5 MW · 13.4 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Gibbons Creek 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-TX
Owner (as stated)
Mid South Electric Coop Assn

Details

Who’s behind it

Owner
Mid South Electric Coop Assn

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
22
Substations at the ends (as the source names them)
Gibbons Creek
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itmid south electric coop assn
HIFLD line ID310030
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Blue Jay Solar I, LLC Under construction Solar 1.9 mi 210
SOSA Energy Center Under construction Storage 10.4 mi 154.6
Tex-Bar ESS Contracted Storage 12.0 mi 201.5
Pecan Prairie South Solar Under construction Solar 13.3 mi 133
Central Utility Plant - Texas A&M Announced Gas, combined cycle 13.4 mi 5

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution