Gila River - Liberty 230 kV: route and 25 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Gila River - Liberty 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-AZ
- Owner (as stated)
- Arizona Public Service
Details
Who’s behind it
- Owner
- Arizona Public Service
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 41
- Substations at the ends (as the source names them)
- Gila River to Liberty
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | arizona public service |
| HIFLD line ID | 309683 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Buckeye Generation Center, LLC Postponed | Gas, combustion turbine | 0.6 mi | 652.2 |
| QTS DATA CENTER Under construction | Large load | 5.8 mi | |
| MICROSOFT CORP - CITRUS RD Built | Large load | 5.8 mi | |
| PHX73 (Goodyear data centre) Filed | Large load | 5.9 mi | |
| PHX 70 - MICROSOFT DATA CENTER Built | Large load | 6.1 mi | |
| Gila Bend Power Generation Station Postponed | Gas, combined cycle | 6.9 mi | 900 |
| COMPASS DATA CENTER - MOONRAKER Built | Large load | 7.1 mi | |
| COMPASS DATACENTERS PHX I Built | Large load | 7.2 mi | |
| Vantage Data Center 21 Under construction | Large load | 7.3 mi | |
| PHX16 Data Center Filed | Large load | 7.5 mi | |
| Vantage AZ15 Under construction | Large load | 7.5 mi | |
| QTS PHX3 Data Center Built | Large load | 7.5 mi | |
| Stream Data Center Built | Large load | 7.9 mi | |
| QTS DC13 - Temp Crane - NE Filed | Large load | 8.1 mi | |
| Crane (Avondale data centre) Filed | Large load | 8.1 mi | |
| Prime Data Center Under construction | Large load | 10.9 mi | |
| Sierra Luna Energy Storage Announced | Storage | 11.1 mi | 150 |
| MERIT 2 Built | Large load | 11.7 mi | |
| White Tank Energy Storage Under construction | Storage | 11.7 mi | 100 |
| Aligned Phx 7 Filed | Large load | 12.0 mi | |
| Microsoft Phx 83 (El Mirage data centre) Filed | Large load | 13.3 mi | |
| Agave Under construction | Storage | 13.4 mi | 150 |
| Red Hawk Under construction | Gas, combustion turbine | 13.5 mi | 392 |
| MICROSOFT CORP - OLIVE AVE Built | Large load | 13.7 mi | |
| Compass Datacenter Under construction | Large load | 14.5 mi |