Show on map
Grand Tower Energy Center LLC — Power plant · Gas, combined cycle · Mainline Generation LLCMurphysboro 1 — Permitted · Solar · IL · 5 MW · 12.9 mi awayMurphysboro 2 — Permitted · Solar · IL · 1.3 MW · 12.9 mi away
  • Combustion
  • Wind & solar
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Grand Tower Energy Center LLC

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycle Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1951
Net generation, 2024
0 MWh
Location
Jackson County, Illinois

Output

Net generation MWh by year, 2001 to 2024
Fuel burned MMBtu by year, 2001 to 2024
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
75 years since 1951
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110041990389
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001515
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2024
Capacity retired
640.9 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Fired Combined Cycle223.2 MWRetiredApril 2024
2Natural Gas Fired Combined Cycle223.2 MWRetiredApril 2024
3Natural Gas Fired Combined Cycle80.9 MWRetiredApril 2024
4Natural Gas Fired Combined Cycle113.6 MWRetiredApril 2024

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Transmission lines within 15 mi (6)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Mainline Generation LLC Operator EIA-860M
ROCKLAND CAPITAL LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2, 3, 4 scheduled to retire, 640.9 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Murphysboro 1 Permitted Solar 12.9 mi 5
Murphysboro 2 Permitted Solar 12.9 mi 1.3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution