Show on map
Gravel Pit Solar, LLC — Power plant · Solar · Gravel Pit Solar, LLCEllington Solar One — Postponed · Solar · CT · 2 MW · 1.9 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 7.0 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 7.6 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 9.0 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 10.8 mi awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 10.8 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 12.2 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 13.4 mi awayWillington Solar One, LLC — Under construction · Solar · CT · 2 MW · 14.5 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Gravel Pit Solar, LLC

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
115 kV to Connecticut Light & Power Co (ISNE)
Location
Hartford County, Connecticut
Operated by
Gravel Pit Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000804980, G100001021302
Location id
L100000804330
Eia plant ids
66268
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
115
Transmission owner
Connecticut Light & Power Co
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 2025499,732
Capacity factor, 20250.139
Net generation (MWh), 2025146,463
Balancing authority codeISNE

Solar arrays

Array area (acres)
333.8
AC capacity (MW)
120
DC capacity (MW)
120
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Ellington Solar One Postponed Solar 1.9 mi 2
CT Airport Authority Solar One Announced Solar 7.0 mi 4
Windsor Locks Under construction Solar 7.6 mi 1.8
Dollar Tree Solar One Postponed Solar 9.0 mi 2
Homestead Fuel Cell Postponed Gas, other 10.8 mi 8.4
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 10.8 mi 11.5
Broadleaf Solar Filed Solar 12.2 mi 200
NU - WETHERSFIELD DATA CENTER Built Large load 13.4 mi
Willington Solar One, LLC Under construction Solar 14.5 mi 2

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution