Show on map
GREC — Power plant · Gas, combined cycle · Grand River Dam AuthorityGREC — Gas, combustion turbine · OK · 594 MW · 0.0 km awayGrand River Energy Center Solar — Solar · OK · 84 MW · 0.4 km awayChimney Rock AOI (Pryor data centre) — Large load · OK · 4.1 km awayMYALL LLC / PRY DATA STORAGE FACILITY — Large load · OK · 6.8 km awayTwelvemile Solar 3 — Solar · OK · 200 MW · 16.6 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1985
Net generation, 2025
3,996,684 MWh
Grid
345 kV, 161 kV to Grand River Dam Authority (SWPP)
Location
Mayes County, Oklahoma
Operated by
Grand River Dam AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Owner
Grand River Dam AuthoritySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
41 years since 1985
Unused energy
11,669 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
8,672 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160058
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001428
Fuel burned (MMBtu), 202534,659,901
Capacity factor, 20250.255
Heat rate (Btu/kWh), 20258,672.2
Net generation (MWh), 20253,996,684.0
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
540 MW
Generators retired
1
Capacity still in service
1,788.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal540 MWRetiredDecember 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV, 161 kV
Transmission or distribution system owner
Grand River Dam Authority
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 540 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
GREC Under construction Gas, combustion turbine 0.0 km 594
Grand River Energy Center Solar Postponed Solar 0.4 km 84
Chimney Rock AOI (Pryor data centre) Filed Large load 4.1 km
MYALL LLC / PRY DATA STORAGE FACILITY Built Large load 6.8 km
Twelvemile Solar 3 Under construction Solar 16.6 km 200