Greene Valley Gas Recovery: location and 20 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Greene Valley Gas Recovery
Power plant · Biomass
Key facts
Power plant · Biomassran 39% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1996
- Net generation, 2025
- 22,352 MWh
- Grid
- 12 kV to Commonwealth Edison Co (PJM)
- Location
- DuPage County, Illinois
- Operated by
- WM Illinois Renewable Energy LLC
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 30 years since 1996
- Heat rate
- 21,349 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 477,194 |
| Capacity factor, 2025 | 0.387 |
| Heat rate (Btu/kWh), 2025 | 21,349.1 |
| Net generation (MWh), 2025 | 22,352 |
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 3.3 MW
- Generators retired
- 1
- Capacity still in service
- 6.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN3 | Landfill Gas | 3.3 MW | Retired | February 2010 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- Commonwealth Edison Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| WM Illinois Renewable Energy LLC | Operator | EIA-860M | ||
| FOREST PRESERVE DISTRICT OF DU | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit GEN3 scheduled to retire, 3.3 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Internationale Ctr 11-SLCHI321 Under construction | Solar | 3.8 mi | 1.8 |
| ENSONO DATA CENTER Built | Large load | 7.2 mi | |
| MERIDIAN PARKWAY DATA CENTER OWNER LLC Built | Large load | 7.3 mi | |
| 360 TCS LLC Built | Large load | 8.7 mi | |
| AC IL - Lockport East Under construction | Solar | 9.0 mi | 3.1 |
| CYRUSONE LLC × 2 units Unknown | Large load | 9.4 mi | |
| EDGED CHICAGO LLC Built | Large load | 9.5 mi | |
| Romeoville 34 - SLCHI234 - BSCHI234 Under construction | Storage | 9.5 mi | 0.5 |
| AC IL - Lockport West Under construction | Solar | 9.7 mi | 3.4 |
| Aurora 7-SLCHI307 Under construction | Solar | 10.4 mi | 1.9 |
| CLEARBLUE TECHNOLOGIES/OAKBROOK INC Built | Large load | 10.7 mi | |
| CLOP CAROL STREAM IL LLC Built | Large load | 12.3 mi | |
| COLOVORE LLC Built | Large load | 12.5 mi | |
| ORD-02 (West Chicago data centre) Filed | Large load | 12.6 mi | |
| IL - SMHEC - Moraine Valley Postponed | Solar | 13.3 mi | 1.3 |
| 1454.07-IL 7 (Gevena data centre) Filed | Large load | 13.5 mi | |
| Glendale Heights 10-SLCHI910 Under construction | Solar | 13.5 mi | 1.3 |
| Addison 11-SLCHI404 Under construction | Solar | 13.7 mi | 1.6 |
| McCook 2-SLCHI102 Under construction | Solar | 14.5 mi | 2 |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA