Show on map
GRS CMS — Power plant · Biomass · Gas Recovery Systems IncAREP DATA CENTER — Large load · NC · 5.5 km awayCLT 16 12MW DATA CENTER — Large load · NC · 21.1 km awayCLT16 - Data Center — Large load · NC · 21.2 km away
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 9% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1999
Net generation, 2025
4,272 MWh
Grid
13 kV to City of Concord - (NC) (DUK)
Location
Cabarrus County, North Carolina
Operated by
Gas Recovery Systems IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
27 years since 1999
Heat rate
16,193 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.90
Transmission owner
City of Concord - (NC)
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202569,177
Capacity factor, 20250.092
Heat rate (Btu/kWh), 202516,193.1
Net generation (MWh), 20254,272
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
AREP DATA CENTER Under construction Large load 5.5 km
CLT 16 12MW DATA CENTER Under construction Large load 21.1 km
CLT16 - Data Center Filed Large load 21.2 km