Harbor Wind LLC — Power plant · Wind · Harbor Wind Tenant LLCM&G Resins USA — Under construction · Other · TX · 28.6 MW · 3.4 mi awayCumbia Energy Center — Announced · Storage · TX · 200 MW · 6.5 mi awayBEACON POINT DATA CENTER PROJECT — Under construction · Large load · TX · 11.0 mi awayPintail BESS — Under construction · Storage · TX · 200 MW · 14.5 mi away
  • Wind & solar
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Harbor Wind LLC

Power plant · Wind

Key facts

Power plant · Wind Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2021
0 MWh
Location
Nueces County, Texas
Operated by
Harbor Wind Tenant LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2021

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
14 years since 2012
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019930
Location id
L100001017941
Eia plant ids
58424
Balancing authority codeERCO

Wind turbines

Turbines
6
Turbine capacity (MW)
9
Turbine models
6 Guodian UP1500
Hub height (m)
80
Rotor diameter (m)
82
Year online
2012

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
August 2019
Capacity retired
9 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Onshore Wind Turbine9 MWRetiredAugust 2019

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ERCO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 9 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · OpenStreetMap · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
M&G Resins USA Under construction Other 3.4 mi 28.6
Cumbia Energy Center Announced Storage 6.5 mi 200
BEACON POINT DATA CENTER PROJECT Under construction Large load 11.0 mi
Pintail BESS Under construction Storage 14.5 mi 200

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution